Skip to main content

Mandrill Mayhem Track Completed

Chessington World Of Adventures
Saturday 28th January 2023

The track for Mandrill Mayhem is complete! The spike has been installed and the rollercoaster circuit is complete... kinda. Of course, with this new rollercoaster being a shuttle coaster it can only run one train due to it not being a full-circle track layout.


With the track now fully installed the bases of each support can now be concreted in to stop them from moving, this is left to last to make sure the supports can move a little bit if needed.  


Work on installing theming elements within the station appears to be progressing well with bamboo added to the console building and the tree we spotted last week now has more detailing on it. It would appear that work on installing lighting in the station has also begun, with lights spotted hanging from the ceiling.  


Across the rest of the ride, theres lots going on such as the installation of fences and probably so much more that we can't see from public and open areas. It would appear that a tarmac path has been installed in a section of the area, it was previously believed that the area might have themed concrete floors.


In the site compound more metal work for a new building can be spotted, with site access now closed off now the spike has been installed we're unsure where this building is for. Upon looking at the test seat again, part of the packaging has become ripped and the vest part of the restraint is now visible. A dark colour brown vest can be seen, its unknown, if these vests will lock like The Swarm, does as never B&M rides that have vests in the restraints don't lock.


The fake ends of the track look amazing. Onto the next stage of construction, wiring up the rollercoaster and then testing!


Recently Posted News Articles