Skip to main content

Ride Hardware Arrives For Project Anchor

Chessington World Of Adventures
Sunday 15th May 2022

It's full steam ahead at Chessington for Project Anchor, with Seastorm being reassembled and Timber Tug Boat being delivered to the park. 


Since our last visit to the park, we've seen big progress for Project Anchor. Timber Tug Boat has received a repainted and has never looked better! The new colours of the boat look fantastic but we feel like it's a shame the base of the ride wasn't repainted, hopefully, this will be covered with some wooden boards? It would also appear that work on gutting the arcade has begun for the queue line for the attraction. If you look closely enough you can also see the metal panels of the ride still say Timber Tug Boat. 


Work on the brand new ride Bobbing Barrels is also progressing well with the queue line for the ride paved and fences installed. A scaffolding roof has been installed over attractions foundations so they can install the ride in peace and without getting rained on.  


Seastorm is also starting to look a lot healthier with arms for the ride reinstalled. Wooden boxes with the Mack logo can still be seen around the area, so the ride could have been waiting for new parts directly from the ride manufacturer. 


Recently Posted News Articles.